SOLARGE

Hotel Delfin, Izola (Slovenia)

Hotel, sports centre | 140 sqm | 90 kWth | 2001

In year 2001 the hotel was renovated. The roof, that was sloped before, is now flat and supports four fields of solar collectors, which are designed exclusively for heating of salt water in internal and external swimming pools. The heat storages have integrated tube heat exchangers and they are connected to the compensation pool, where fresh sea water is added and disinfected.

See database details


Dom paraplegikov, Pacug (Slovenia)

Hotel, Hospital and Sports centre | 78 sqm | 50 kWth | 2006

The Health Resort is designed for invalids and offers them an option for healthy and relax vacations. Invalid sportsman can use the resort for preparation for sport competitions.
The solar system is used for tap water heating and preheating of swimming pool water. It will operate throughout the whole year.

See database details


Dom starejših obcanov Preddvor, Preddvor (Slovenia)

Pension house | 144 sqm | 100 kWth | 1990/2000

Elderly home Preddvor is home of 190 guests, mainly pensioners and disable peoples. There are two residential buildings, an older one (1860) and a newer one, built in 1990. The buildings are well maintained, still not thermal insulated. Since 2003 the buildings are heated by biomass district heating plant.


See database details


Dom starejših obcanov Tezno, Maribor (Slovenia)

Pension house | 100 sqm | 70 kWth | 2003

Solar system is built at Elderly home TEZNO in Maribor. Solar system is used for heating of hot tap water. There are 100 sqm of selective flat solar collectors placed on flat roof. System was built in 2003. Half of the investment was paid by the owners of the elderly home, the other half was paid by municipality of Maribor in form of non-refundable funds.

See database details


Dom Tisje, Šmartno pri Litiji (Slovenia)

Pension house | 175 + 43 sqm | 140 kWth | 1992–94

Two systems operate in Elderly home Tisje. The larger one with a solar collector aperture area of 160 m2 is used for preheating of tap water, the smaller one (aperture area 40 m2) for heating of water for washing and drying of linen. In both systems oil boilers are used for backup heating. In the year 2005 they started an energy reconstruction.

See database details


Inn "Pri Bostjanu", Škofja Loka (Slovenia)

Hotel | 30 sqm | 21 kWth | 2004

The inn „Pri Boštjanu‘‘ (700 m) is built in the hilly surrounding. They are a well known tourist destination because of the beautiful landscape. In order to improve their “environmental image” they installed the CSTS in 2003, followed by the reconstruction of the heating system. Fossile fuels are fully replaced now.


See database details (temporarily not available)


Technology centre Špan, Brezovica pri Ljubljani (Slovenia)

Car centre with coffee house | 44 sqm | 20 kWth | 2005

Špan d.o.o. is a family company that is working in vulcanizing business for 25 years. In 2005 they have expanded their business also in car selling, technical inspections and car washing. For this they have built the new centre with total ground area of 3,000 sqm.


See database details


Terme Catez / Hotel Zusterna, Koper (Slovenia)

Hotel & Sports centre | 600 sqm | 420 kWth | 2001

The solar system is built at hotel Zusterna at the seaside. It is used for heating of the outdoor swimming pool and was installed during the renovation in 2001. The whole roof of an indoor swimming pool is used as solar roof with unglazed solar collectors. The costs of the solar collector were only 40,2 €/sqm because only additional costs for stainless steel piping and pump was paid.

See database details


Terme Snovik, Kamnik (Slovenia)

Hotel & Sports centre | 81 sqm | 57 kWth | 2004

Company Terme Snovik d.o.o. is a fast developing company which manages tourist-recreational centre in village Snovik.
Building was built in accordance with high thermal insulation level standard from year 2001. From the beginning geothermal water (26°C) and liquid gas (LG) is used.

See database details


Župnijska cerkev Sv. Petra in Sv. Pavla, Zagorje ob Savi (Slovenia)

Church | 34 sqm | 22 kWth | 2002

Parish church in Zagorje ob Savi was build in 1874, mainly from the stones. A renovation was started in 2000.
According to the good experience with low temperature walls heating in another church the same system was chosen. It is used only for heating and – in contrast to the back-up boilers – it operates throughout the whole year.

See database details